Pipiroa to Kopu CLOSED - Click here for more info

Kaiaua to Thames
Thames to Paeroa
Paeroa to Waihi
Paeroa to Te Aroha
Te Aroha to Matamata
8
Jun
@legobackpacker on Instagram

Karangahake Gorge Tunnel Temporary Closure

The Karangahake Gorge Tunnel located on Section C of the Hauraki Rail Trail will close temporarily for sealing works from the 15th June through until the 1 July.  The Tunnel will be closed at all times for the duration of this period, re-opening on the 2 July in time for the school holidays.

A detour option for riders would be to walk the track on the opposite side of the river, but under no circumstances should you ride this section.  This part of the track is narrow and NOT suitable for cycling.

A Map of Section C can be found here, with a more detailed Google Map of the Gorge here.

Please ride safely and many thanks for your understanding.

 

« Back to News
xeno web development - xeno web development